|
|
|
|
|
|
|
|
|
Each
NC Slitter becomes automatically
set within 30 seconds by a +0.1mm
range of error while the slitter
knife position is changed constantly
and continually. .Adjustment is
easy and position change program
can be input without stopping
JIPIL when the knife should be
changed or its life should be
extended. Program control centralization
enables ease of operation, asa
well as continuous precision that
decrease the risk of defective
goods caused by human error.It
is designed and manufactured to
control programs quickly and accurately.
It complements the existing program,
is cost-effective and can easily
be attached to existing machines.
|
|
|
|
|
|
|
|
|
|
|
|
|